Lockheed Martin Proposes 10-Year F-35 Production Framework
Lockheed Martin announced a 10-year, 850-aircraft F-35 production framework, pending congressional authorization for multiyear procurement.
Key Takeaways
- •Proposed 10-year framework covers 850 F-35 aircraft for the U.S. military.
- •Framework maintains a consistent production rate of 156 aircraft annually.
- •Requires congressional multiyear procurement authority and appropriations.
- •Program expected to support 317,000 U.S. jobs over the next decade.
Strategic Shift in F-35 Procurement
Lockheed Martin announced on October 22, 2026, a new production and sustainment framework for the Lockheed Martin F-35 Lightning II, a multirole fifth-generation stealth fighter. The proposed 10-year plan outlines the production of 850 aircraft for the U.S. military, alongside initial spares, 10 years of modification kits, and sustainment services. The framework anticipates maintaining a steady production rate of 156 aircraft annually, inclusive of international customer orders.
This initiative marks a significant departure from the historical practice of annual contracting cycles, such as the September 2025 contract for Lots 18 and 19. By moving toward a multiyear procurement model, Lockheed Martin and the U.S. government aim to stabilize the industrial base and improve mission-capable rates.
Leadership Perspectives
"This multiyear framework strengthens the way we can plan and invest in the F-35 enterprise," said Jim Taiclet, Chairman, President, and CEO of Lockheed Martin. "With the greater certainty that comes from the U.S. government's transformative approach to F-35 production and sustainment, we can make the upfront investments needed to expand capacity, improve efficiency, and build a more resilient supply chain."
OJ Sanchez, President of Lockheed Martin Aeronautics, noted the impact on the supply chain, stating, "Our new multiyear framework gives suppliers stability to plan for the future and invest with confidence, improving readiness across the F-35 fleet."
Operational and Economic Impact
Lockheed Martin projects that the program will support 317,000 jobs in the U.S. and generate approximately $79 billion in annual economic activity over the next decade. The company expects the agreement to save billions of dollars by leveraging long-term pricing and industry volume discounts. Furthermore, the framework allows for bulk procurement of raw materials and critical parts, which is intended to reduce turnaround times and mitigate bottlenecks that have previously constrained production.
As of October 2026, there are more than 1,375 F-35s fielded globally across 13 countries, with the fleet having surpassed 1 million flight hours as of March 2025. The aircraft currently operates from 42 bases worldwide.
Regulatory Requirements
The 10-year framework remains contingent upon the U.S. Congress granting specific multiyear procurement authority and providing the necessary appropriations. If authorized, the F-35 Joint Program Office (JPO) and Lockheed Martin would finalize contract terms, pricing, and schedules under a formal contract award. This legislative process is expected to occur between late 2026 and 2027.
Frequently Asked Questions
- What is required for the new F-35 framework to become a formal contract?
- The framework is pending multiyear procurement authority and appropriations from the U.S. Congress. If granted, these actions would allow the F-35 Joint Program Office and Lockheed Martin to finalize terms, pricing, and schedules.
- How does the proposed framework differ from previous F-35 contracting?
- The framework aims to replace the previous, constrained annual contracting cycles with a 10-year model. This shift is designed to provide supply chain stability, enable bulk procurement of materials, and allow for long-term production planning.
Access up-to-date commercial aviation news and airline industry developments via omniflights.com. For reporting on UAP sightings, investigations, and aviation-related encounters, see the UAPs section at omniflights.com/uaps.

Written by Shashank Shukla
Co-Founder & CTO leading the engineering and AI systems behind Omni Flights. Covers aviation technology, flight safety, aircraft manufacturing, and emerging aerospace developments.
Visit Profile